How Projects Go Awry
HVAC Engineering - Over the years, we have observed many cases of building humidity gone wild, with the attendant formation of mold or other moisture damage. Condensation can be the result of actions by the various players in the construction process.
Many other HVAC related problems can arise, but are generally due to the same behaviors.
The Designer
• A design that does not provide for humidity control.
• Incomplete design documents.
• Incorrect temperature control sequence.
• Shoddy review of shop drawings.
• Failure to verify operation of the system in the field.
The Contractor
• Substitutions based on price, not function.
• Poor workmanship.
• Misunderstanding of contract document intent.
• Inadequate due diligence of vendor product submittals.
The Vendor
• Misunderstanding of contract document requirements.
• Yielding to contractor/owner pressure on price.
• Failure to advise on implications of alternate product submittal.
Disclaimer: While every effort has been made to ensure the accuracy of this publication, it is not intended to provide legal advice as individual situations will differ and should be discussed with an expert and/or lawyer.For specific technical or legal advice on the information provided and related topics, please contact the author.